Project Description
Client: Rokon
Location: Chirnside Park, Melbourne, Victoria
Duration: 6 months
Cost: $1,200,000
Construction of all retaining walls at this new high density sub division. Involved over 1200 lm of sleeper walls ranging from 400mm – 3.2 high, including two rock retaining walls with over 800 m2 of rock face up to 3.6 high.
The Challenges
This site was not an easy site due to its small size, the amount of retaining walls involved, and most drilling had to be done into very hard shale rock. But the job still came in on budget and on time.