Client:   Texco
Location:  Truganina, Melbourne, Victoria
Duration: 5 weeks onsite
Cost: $300,000
Date: 2023

A 200m long concrete sleeper wall was constructed with a maximum height of 2.0m and subject to a 20 kPa surcharge load from the adjacent property. Significant rock drilling was required in hard basalt material for the pier foundations. Steel soldiers were 200UC46 material, with lengths up to 4.6m at an average embedment of 2.8m.