
Project Description
Location: Melbourne, Victoria
Duration: 4 weeks
Cost: $100,000
This was a challenging retaining wall project as the wall was constructed from the top of the wall levels and there was not a straight line for more than 6m, nor was the retaining wall the same level for any long period of time.