Burwood Hwy SUP | Retaining Walls Melbourne | Stringline

Burwood Highway SUP

Burwood Hwy SUP | Retaining Walls Melbourne | Stringline

Project Description

Client:   Bitu-Mill P/L
Location:   Burwood Highway, Vermont South, Melbourne, Victoria
Duration: 6 weeks onsite
Cost: $332,000
Date: 2021

The retaining walls were built to a VicRoads specification, project #13561. The VicRoads specification called for concrete sleepers that were 2.36m long x 0.3m high x 125mm thick with 3 x N16 reinforcement bars. The design also called up pier cages and relatively deep embedment up to 3-4 deep. The wall retained a shared user path adjacent to Burwood highway and a Melbourne water reserve. Due to the site’s proximity to a water course, when drilling some sections of the retaining wall, ground water was encountered, and pier casings were required..

Concrete Rock Retaining Walls and Concrete Structures Melbourne | Stringline

Buttercross Park Mernda

Concrete Rock Retaining Walls and Concrete Structures Melbourne | Stringline

Project Description

Client:   Ace Contractors
Location:   Buttercross Park, Mernda, Victoria
Duration: 10 weeks
Cost: $162,000

Stringline built all the rock walls, gabions, and in-situ concrete structures for two recreational parks in this new residential estate. The works were time-based as defined by the principal contractor.

Bio Retention Basin Caroline Springs Concrete Structures Melbourne | Stringline

Bio Retention Basin – Caroline Springs

Concrete Structures Melbourne | Stringline

Project Description

Client:   Winslow Constructions
Location:   Caroline Springs, Melbourne, Victoria
Duration: 8 days
Cost: $28,000

This project was for the construction of a 1m high retaining wall built into the pre-excavated Bio Basin, followed by filling the basin with filter material.

Concrete Structures Melbourne | Stringline

Clarinda Culvert Structure – Cranbourne

Concrete Structures Melbourne | Stringline

Project Description

Client:   Winslow Constructions
Location:   Cranbourne, Melbourne, Victoria
Duration: 8 weeks onsite
Cost: $100,000

Construction of an 80-unit culvert structure located in Cranbourne South. This was a little harder to construct due to active water way and soft ground condition due to sandy loam.

Arbourlea Culvert Structure - Clyde Concrete Structures Melbourne | Stringline

Arbourlea Culvert Structure – Clyde

Arbourlea Culvert Structure - Clyde Concrete Structures Melbourne | Stringline

Project Description

Client:   Winslow Constructions
Location:   Clyde, Melbourne, Victoria
Duration: 9 weeks
Cost: $300,000

Construction of all concrete aspects of this 130-unit Culvert Bridge over the Arbourlea Culvert wetland in Clyde.

Arbourlea Boardwalk - Clyde Concrete Structures Melbourne | Stringline

Arbourlea Boardwalk – Clyde

Arbourlea Boardwalk - Clyde Concrete Structures Melbourne | Stringline

Project Description

Client:   Winslow Constructions
Location:   Clyde, Melbourne, Victoria
Duration: 11 weeks offsite, 3 weeks onsite
Cost: $360,000

Construction of all aspects of a 3.0 metre wide Boardwalk across the Melbourne Water Wetlands located at the new Arbourlea estate.

Concrete Structures Melbourne | Stringline

Urban Wetlands – Caroline Springs

Concrete Structures Melbourne | Stringline

Project Description

Client:   Excell Gray Bruni
Location:   Caroline Springs, Melbourne, Victoria
Duration: 14 months
Cost: $1,800,000
Award Winner: 2014 Urban Development Institute of Australia’s (UDIA) Environmental Excellence Award

Construction of all concrete aspects of this multi million dollar wetland for Melbourne water. Works included designing and supplying all concrete tilt panels, all footings, and all in situ concrete retaining walls.