Cambridge Rise – Melbourne

Retaining Walls Melbourne | Stringline

Project Description

Location:   Melbourne, Victoria
Duration: 18 weeks
Cost: $800,000

Constructed 720 lm of concrete retaining walls with heights ranging from 200mm – 3.6 high for this new residential estate.

Retaining Walls Melbourne | Stringline

Hallam Road Bypass

Retaining Walls Melbourne | Stringline

Project Description

Client:   Negri Contractors
Location:   Hallam, Melbourne, Victoria
Duration: 4 weeks
Cost: Day Rates Only

Manage construction of 180 lm’s of concrete sleeper retaining walls to Vic Road specifications – based on a labour and management aspect, as the client was supplying all materials. Stringline supplied all construction drawings and steel schedules, as well ‘S’ panel and sleeper schedules. Stringline received a 5-star rating from VicRoads for outstanding OHS practices.

Retaining Walls Melbourne | Stringline

The Gardens Estate Chirnside Park

Retaining Walls Melbourne | Stringline

Project Description

Client:   Rokon
Location:   Chirnside Park, Melbourne, Victoria
Duration: 6 months
Cost: $1,200,000

Construction of all retaining walls at this new high density sub division. Involved over 1200 lm of sleeper walls ranging from 400mm – 3.2 high, including two rock retaining walls with over 800 m2 of rock face up to 3.6 high.

The Challenges

This site was not an easy site due to its small size, the amount of retaining walls involved, and most drilling had to be done into very hard shale rock. But the job still came in on budget and on time.

Retaining Walls Melbourne | Stringline

Mernda Retirement Village Road 2 Wall

Retaining Walls Melbourne | Stringline

Project Description

Client:   Winslow Constructions
Location:   Mernda, Melbourne, Victoria
Duration: 12 weeks
Cost: $1,000,000

The upright steel is the largest rolled H beam on the market. All panels were specially fabricated to suit. The methodology for the construction of this retaining wall was unique as we were protecting existing assets located close behind the retaining wall.

The Challenges

This project was a big undertaking for Stringline due to its value and short timeframe. The retaining wall was designed to have a 25Kpa loading so all of the components were specially ordered, even down to the steel and panels.

Retaining Walls Melbourne | Stringline

The Range Croydon – Stage 4, 9, 22

Retaining Walls Melbourne | Stringline

Project Description

Client:   Winslow Constructions
Location:   Croydon, Melbourne, Victoria
Duration: 18 weeks
Cost: $680,000

This project was a design construct of approx. 300lm of sleeper walls and 120 lm of rock retaining walls ranging from 1.0 – 3.2 mtrs high.

The Challenges

The tight access and ground conditions made this a tough site to work in.