The Range Croydon stage 4, 9, 22


This project was a design construct of approx. 300lm of sleeper walls and 120 lm of rock retaining walls ranging from 1.0 – 3.2 mtrs high.

The tight access and ground conditions made this a tuff site to work in.

Duration 18 weeks
Cost 680 k
Client Winslow Constructions
Location: Croydon, Melbourne, Victoria

  • Untitled 7
  • Untitled 1
  • Untitled 10
  • Untitled 2
  • Untitled 5
  • The Range
  • Untitled 7
  • Untitled 1
  • Untitled 10
  • Untitled 2
  • Untitled 5
  • The Range

Mernda Retirement Village Road 2 Wall


This project was a big under taking for Stringline due to it value and short time frame. The retaining wall was designed to have a 25Kpa loading so all components were special order even down to the steel and panels.

The upright steel is the largest rolled H beam on the market. All panels were specially fabricated to suit. The mythology for the construction of this retaining wall was unique as we were protecting existing assets located close behind the retaining wall.

Duration 12 weeks
Cost 1 million
Client Winslow Constructions
Location: Mernda, Melbourne, Victoria

  • Untitled 1
  • Untitled 3
  • Untitled 5
  • Untitled 7
  • Untitled 8
  • Untitled 1
  • Untitled 3
  • Untitled 5
  • Untitled 7
  • Untitled 8

Cambride Rise

Construct 720 lm of concrete retaining walls over 2 stages height ranging from 200mm - 3.6 high.
Duration: 18 weeks
Cost: $800 k
Location: Melbourne, Victoria

  • Untitled 10
  • Untitled 14
  • Untitled 5
  • Untitled 6
  • Untitled 8
  • Untitled 10
  • Untitled 14
  • Untitled 5
  • Untitled 6
  • Untitled 8

Mingarra Retirement Village, Croydon

Outline: This was a challenging retaining wall project as the wall was constructed from the top of wall levels and there was not a straight line for more than 6m, nor was the retaining wall the same level for any long period of time.

Duration onsite: Six weeks
Cost: $250,000
Client: Civilworxs Constructions
Location: Croydon, Melbourne, Victoria

  • Mingarra Croydon 01
  • Mingarra Croydon 02
  • Mingarra Croydon 03
  • Mingarra Croydon 04
  • Mingarra Croydon 05
  • Mingarra Croydon 01
  • Mingarra Croydon 02
  • Mingarra Croydon 03
  • Mingarra Croydon 04
  • Mingarra Croydon 05

Heritage Hills 5, 7 & 3

Design & Construction of approx. 300 lm concrete sleeper walls, which included all permits and certification

Duration: 4 weeks
Cost: 100K
Client: Rokon
Location: Melbourne, Victoria

  • Heritage Hills 3
  • Untitled 2
  • Untitled 3
  • Untitled 4
  • Heritage Hills 3
  • Untitled 2
  • Untitled 3
  • Untitled 4

Harcrest Estate, Wantirna (three stages)

Outline: Construction of timber walls and brick retaining walls to three stages. Many walls were constructed along sewer easements, and required extra work to comply.

Duration: Ongoing
Cost: Ongoing
Client: Winslow Constructions
Location: Wantirna, Melbourne, Victoria

  • Harcrest Estate
  • Harcrest Rd Bypass 02
  • Harcrest Rd Bypass 03
  • Harcrest Rd Bypass 04
  • Harcrest Rd Bypass 05
  • Harcrest Estate
  • Harcrest Rd Bypass 02
  • Harcrest Rd Bypass 03
  • Harcrest Rd Bypass 04
  • Harcrest Rd Bypass 05

The Gardens Estate Chirnside Park

http://www.sunlandgroup.com.au/property/the-garden
Construction of all retaining walls to this new high density sub division. Over 1200 lm of sleeper walls ranging from 400mm – 3.2 high, including 2 rock retaining walls involving over 800 m2 of rock face and up to 3.6 high.

This site was not an easy site due to its small size yet the amount of retaining walls involved. Most drilling was into very hard shale rock. But the job still came in on budget and time frame.

Duration 6 months
Cost 1.2 million
Client Rokon
Location: Chirnside Park, Melbourne, Victoria

  • Untitled 1
  • Untitled 14
  • Untitled 17
  • Untitled 3
  • Untitled 4
  • Untitled 1
  • Untitled 14
  • Untitled 17
  • Untitled 3
  • Untitled 4

Rosenthal 1, 2, 4, 5 & 6


Stringline have been the sole retaining wall contractor engaged to construct all retaining walls for this 1300 home new sub division located in Sunbury Victoria.

http://rosenthal.com.au

Walls range from 600mm high up to 3.6 mtrs high.

Duration ongoing since early 2014
Cost: Ongoing
Client Winslow Constructions.
Location: Sunbury, Melbourne, Victoria

  • Rosenthal 4-6
  • Untitled 15
  • Untitled 13
  • Untitled 22
  • Untitled 27
  • Rosenthal 4-6
  • Untitled 15
  • Untitled 13
  • Untitled 22
  • Untitled 27

Arbourlea Boardwalk Clyde

Construction of all aspects of a 3.0 mtr wide Boardwalk across the Melbourne Water Wetlands located at the new Arbourlea estate.

Duration: 11 weeks offsite 3 weeks onsite
Cost: $360,000.00
Client: Winslow Constructions
Location: Clyde, Melbourne, Victoria

 
 
  • Untitled 1
  • Untitled 2
  • Untitled 3
  • Untitled 4
  • Untitled 5
  • Untitled 1
  • Untitled 2
  • Untitled 3
  • Untitled 4
  • Untitled 5

Arbourlea Culvert Structure

Construction of all concrete aspects of this 130-unit Culvert Bridge over the wetland. Installation of all Culverts.

Duration: 9 weeks
Cost: 300K
Client: Winslow Constructions
Location: Melbourne, Victoria

 
  • Arbourlea Culvert
  • Untitled 2
  • Untitled 3
  • Untitled 4
  • Arbourlea Culvert
  • Untitled 2
  • Untitled 3
  • Untitled 4

Clarinda Culvert structure


Construction of an 80-unit culvert structure located in Cranbourne south. This was a little harder to construct due to active water way and soft ground condition due to sandy loam.
The final outcome was worth taking out time.

Duration: 8 weeks onsite
Cost: 100k
Client: Winslow constructions
Location: Cranbourne, Melbourne, Victoria

  • Clarinda Culvert
  • Untitled 2
  • Untitled 3
  • Untitled 4
  • Untitled 5
  • Clarinda Culvert
  • Untitled 2
  • Untitled 3
  • Untitled 4
  • Untitled 5

Hallam Rd Bypass

Outline: Manage construction of 180 lm’s of concrete sleeper retaining walls to Vic Road specifications - based on a labour and management aspect, as the client was supplying all materials. Stringline Pty. Ltd. supplied all construction drawings and steel schedules, as well ‘S’ panel and sleeper schedules.
Outcome: Stringline Pty. Ltd. received a 5-star rating from Vic Roads for outstanding OHS practices.

Duration onsite: Four weeks
Cost: Day Rates Only
Client: Negri Contractors
Location: Melbourne, Victoria

  • Hallam Rd Bypass 01
  • Hallam Rd Bypass 02
  • Hallam Rd Bypass 03
  • Hallam Rd Bypass 04
  • Hallam Rd Bypass 05
  • Hallam Rd Bypass 01
  • Hallam Rd Bypass 02
  • Hallam Rd Bypass 03
  • Hallam Rd Bypass 04
  • Hallam Rd Bypass 05

Masters Home Improvement store, Dandenong

Outline: Construction of about 280 lm’s of concrete sleeper retaining walls up to 3.2m high with a portion of the wall that was constructed on a 19m radius. This project included all drainage material, drainage pipes and risers, with concrete spoon drain and pits to the top of wall.

Duration: Delayed by extremely bad weather but was completed with professionalism
Cost: $372,000
Client: Vaughan’s Constructions
Location: Dandenong, Melbourne, Victoria

  • Masters Sunbury 01
  • Masters Sunbury 02
  • Masters Sunbury 03
  • Masters Sunbury 04
  • Masters Sunbury 05
  • Masters Sunbury 01
  • Masters Sunbury 02
  • Masters Sunbury 03
  • Masters Sunbury 04
  • Masters Sunbury 05

Gisbourne Residential

Outline: Supply and construction of timber retaining walls and the construction of a dry-stack boulder retaining wall. The timber retaiining walls at the rear of the property were also deepened to allow for a future swimming pool.

Duration onsite: Eight weeks
Cost: $46,000
Client: Individual
Location: Gisbourne, Melbourne, Victoria

  • Gisbourne Residential 01
  • Gisbourne Residential 02
  • Gisbourne Residential 03
  • Gisbourne Residential 01
  • Gisbourne Residential 02
  • Gisbourne Residential 03

Merdna Retirement village (four stages)

Outline: Design and construct retaining walls to stages one to four (stages three and four remaining). Stages one and two are completed.

Duration onsite: 2 years working to date
Cost: ongoing
Client: Winslow Constructions
Location: Melbourne, Victoria

  • Merdna Village 01
  • Merdna Village 02
  • Merdna Village 03
  • Merdna Village 04
  • Merdna Village
  • Merdna Village 01
  • Merdna Village 02
  • Merdna Village 03
  • Merdna Village 04
  • Merdna Village

Uni Hill, Bundoora

Outline: Construction of concrete pattern sleeper retaining walls ranging from 200 – 4.4 high. This job was built on the edge of an environmentally significant site. All material to the back of 4.4 mtr high retaining walls was fill material, which required reinforcement.

Duration onsite: 4 months
Cost: $750,000
Client: Winslow Constructions
Location: Bundoora, Melbourne, Victoria

  • Uni Hill 01
  • Uni Hill 02
  • Uni Hill 03
  • Uni Hill 04
  • Uni Hill 05
  • Uni Hill 01
  • Uni Hill 02
  • Uni Hill 03
  • Uni Hill 04
  • Uni Hill 05

Spavin and Riddell Estate, Sunbury

Outline: Design and construction of 480 lm of timber retaining walls and 380 lm of rock retaining walls for this new estate - which included all permits and certifications.

Duration onsite: Six weeks
Cost: $250,000
Client: Winslow Constructions
Location: Sunbury, Melbourne, Victoria

  • Spavin Riddell 01
  • Spavin Riddell 02
  • Spavin Riddell 03
  • Spavin Riddell 04
  • Spavin and Riddell Estate, Sunbury
  • Spavin Riddell 01
  • Spavin Riddell 02
  • Spavin Riddell 03
  • Spavin Riddell 04
  • Spavin and Riddell Estate, Sunbury

Aston, Craigieburn (Stage 9, 12 and 13 rock walls)

Outline: This project included construction of rock retaining walls, including building permits, a building surveyor and certificates of compliance for 850 metre lengths of retaining walls ranging from 200mm high to 1.8m high. The rock material was imported from Coldstream Quarries in Healsville Victoria. The footings were excavated by Stringline Pty. Ltd. and about 40 per cent was excavated rock.

Duration 12 weeks
Cost: 371,000
Client Winslow Constructions
Location: Craigieburn, Melbourne, Victoria

  • Gallery Aston 01
  • Gallery Aston 02
  • Gallery Aston 03
  • Gallery Aston 04
  • Gallery Aston 01
  • Gallery Aston 02
  • Gallery Aston 03
  • Gallery Aston 04

Bio Retention Basin, Caroline Springs

This project was for the construction of a 1m high retaining wall built into the pre-excavated Bio Basin, followed by filling the basin with filter material.

Duration onsite: Eight Days
Cost: $28,000
Client: Winslow Constructions
Location: Caroline Springs, Melbourne, Victoria

  • Bio Retention Basin 01
  • Bio Retention Basin 02
  • Bio Retention Basin 01
  • Bio Retention Basin 02

Eyensubury Estate

Outline: Barrier fencing, culvert structures and all rockwork to rain gardens for several stages of works.


Duration: Varied based on works available
Cost: $105,000
Client: Winslow Constructions
Location: Eyensbury, Melbourne, Victoria

  • Eyensubury Fencing 01
  • Eyensubury Fencing 02
  • Eyensubury Fencing 03
  • Eyensubury Fencing 04
  • Eyensubury Fencing 01
  • Eyensubury Fencing 02
  • Eyensubury Fencing 03
  • Eyensubury Fencing 04

The Promenade Gabions, Point Cook

Outline: Construction of a mass gabion retaining wall to retain an existing wall that was failing.


Duration onsite: 10 weeks
Cost: $210,000
Client: Excell Gray Bruni
Location: Point Cook, Melbourne, Victoria

  • The Promenade Gabions 03
  • The Promenade Gabions 01
  • The Promenade Gabions 02
  • The Promenade Gabions 04
  • The Promenade Gabions 05
  • The Promenade Gabions 03
  • The Promenade Gabions 01
  • The Promenade Gabions 02
  • The Promenade Gabions 04
  • The Promenade Gabions 05

Rock Beaching Wetlands, Sunbury

Outline: Construction of rock chutes to a Melbourne Water wetland.


Duration onsite: Two weeks
Cost: $68,000
Client: Ertech
Location: Sunbury, Melbourne, Victoria

  • Rock Beaching Wetlands 2
  • Rock Beaching Wetlands 1
  • Rock Beaching Wetlands 3
  • Rock Beaching Wetlands 4
  • Rock Beaching Wetlands 5
  • Rock Beaching Wetlands 2
  • Rock Beaching Wetlands 1
  • Rock Beaching Wetlands 3
  • Rock Beaching Wetlands 4
  • Rock Beaching Wetlands 5

Tarneit

Outline: Construction of tilt panel retaining walls and 800 lm of an insitu concrete retaining wall.


Duration onsite: Seven months
Cost: $2.2 million
Client: Winslow Constructions
Location: Tarneit, Melbourne, Victoria

  • Tarneit 01
  • Tarneit 02
  • Tarneit 03
  • Tarneit 04
  • Tarneit 05
  • Tarneit 01
  • Tarneit 02
  • Tarneit 03
  • Tarneit 04
  • Tarneit 05

 


Rees Rd, Melton

Outline: Construction of concrete sleeper retaining walls and handrailing. This project involved drilling down 6 metres into solid rock for piers.


Duration onsite: Four months
Cost: $450,000
Client: Winslow Constructions
Location: Melton, Melbourne, Victoria

  • Rees Rd 01
  • Rees Rd 02
  • Rees Rd 03
  • Rees Rd 04
  • Rees Rd 05
  • Rees Rd 01
  • Rees Rd 02
  • Rees Rd 03
  • Rees Rd 04
  • Rees Rd 05
 

Urban Wetlands, Caroline Springs

Outline: Construction of all concrete aspects of this multi million dollar wetland for Melbourne water. Works included designing and supplying all concrete tilt panels, all footings, and all Insitu concrete retaining walls.

Award Winner: 2014 Urban Development Institute of Australia’s (UDIA) Environmental Excellence Award
Duration: 14 Months
Cost: $1.8 million
Client: Excell Gray Bruni
Location: Caroline Springs, Melbourne, Victoria

  • Urban Wetlands A 1
  • Urban Wetlands A 2
  • Urban Wetlands A 5
  • Urban Wetlands A 4
  • Urban Wetlands A 3
  • Urban Wetlands A 1
  • Urban Wetlands A 2
  • Urban Wetlands A 5
  • Urban Wetlands A 4
  • Urban Wetlands A 3

Buttercross Park, Mernda

Outline: All rock retaining walls, gabions, and insitu concrete structures for two recreational parks for a new residential estate. The works were time-based on works by a principle contractor.

Onsite Duration: 10 weeks
Cost: $162,000
Client: Ace Contractors
Location: Mernda, Melbourne, Victoria

  • Buttercross Park 01
  • Buttercross Park 02
  • Buttercross Park 03
  • Buttercross Park 04
  • Buttercross Park 05
  • Buttercross Park 01
  • Buttercross Park 02
  • Buttercross Park 03
  • Buttercross Park 04
  • Buttercross Park 05

Masters Home Improvement store, Sunbury

Outline: Construction of 300 lm’s of concrete sleeper retaining wall ranging from 400mm high to 3.6m high - using two different types of sleepers.

Duration: 12 weeks
Cost: $390,000
Client: Winslow Constructions
Location: Sunbury, Melbourne, Victoria

  • Masters Dandenong 01
  • Masters Dandenong 02
  • Masters Dandenong 03
  • Masters Dandenong 04
  • Masters Dandenong
  • Masters Dandenong 01
  • Masters Dandenong 02
  • Masters Dandenong 03
  • Masters Dandenong 04
  • Masters Dandenong